Our Work in HOEC
Major EPC contractor is M/S Technip KT
Value of the project Rs.15.00 CR
Our Team involved in this project
- Project Manager – 01
- Site Engineering -09
- Documentation work – 2
- Site Safety Engineer – 03
- Total employees uitlizated the project – 112
- Total hours – 2208 hrs
Total Hours
Budjet in Cr.
%
client satisfaction
The project’s major EPC contractor is M/S Technip KT Indin Limited, Delhi. We are the subcontractor to them
MEP Contractor Value of the project Rs.15.00 CR
- Pipeline fabrication with erection, commissioning including an extra joint test with insulation painting
- Pre Engineered Building Including civil /electrical / inside of the equipment installation Insulation supply with application / Fire fitting system /commissioning
- Reporting to Mr Millappan Site Incharge Techniip KT India Limited
- Performance Reporting to MR. Jalapathy RCM Technip KT India Limited
Duration 92 days (24 /7)
Technicians Electrical – 10
Instrumentation Engineer -5
Insulation Technicians -25
Fabrication Erection – 45
Crane 12 MT – 2 Nos
Case Study - Our Work in DSSL
We are the Director Contract form plan equipment supply testing and commissioning MEP Service.
Project Value: Rs.116.00 Cr
Case Study - Our work in IOTL
We are doing the business with IOTL / Namkkal Puduchtharam location Tamilnadu
Duration: 30 days 24 X 7