Our Work in DSSL
We are the Director Contractor
Value of the project Rs.16.00 CR
Work execution method
Our Company Executive Director, To make the plan discuss with the project team as per the client drawing
- Project manager to ensure that based on the field
- The experienced engineer will be taken care for the execution the work
- Engineering should be inspection all active in the work
- The third part inspection is done by the client’s scope
- We have to coordinate the QC
Total Hours
Budjet in Cr.
%
client satisfaction
Dhanalakshmi Srinivasan Sugar Limited
Scope of design: Spray & DSSPL
We are the Director Contract form plan equipment supply testing and commissioning MEP Service.
- Reporting to Mr. Palanivelrajan, Incharge, DSSPL
- Performance Reporting to Mr. Srinivasan, Executive Director, DSSPL.
Rs.115,89,56,800 Cr
- Sugar bin manufacturing and supply testing commissioning
- Storage MS Tank manufacturing and process pipeline fabrication were done by the client’s requirement
- Way bride supply testing commissioning
- Pre-engineered buildings done by the industries
- PAN -01 PAN -02 PAN -03 Manufacturing supply testing commissioning painting insulation
- Overall plant equipment erection testing commissioning
Accommodation shed construction by us with our own scope with running canteen 24 x 7
We make it a light arrangement for night work with more than 100 watts focus based on the location where we required
On-site fabrication erection separate team with welding testing inspection fabrication yard
Safety Engineer
Safety engineer to ensure all our team wear the PPE Kid and inspection Avery time including crane operator
Our total Team Involved in this project
Executive Director – 01
Project Director – 01
Project Manager -01
Safety Engineer – 06
Engineer – 30
Total Technicians /MEP – 235
Total hours – 7440
Case Study - Our Work in HOEC
We are the subcontractor to M/S Technip KT Indin Limited, Delhi. MEP Contractor Value of the project Rs.15.00 CR
Project Value: Rs.15.00 Cr
Case Study - Our work in IOTL
We are doing the business with IOTL / Namkkal Puduchtharam location Tamilnadu
Duration: 30 days 24 X 7